EWI Installation, Birmingham: 2013

 Project

  • 9 storey block, concrete wall construction with a mosaic tile render finish.
  • Major external refurbishment work needed to enable the building to comply with current standards and meet new current thermal building regulations and CO2 emissions.

 Solution

  • External Wall Insulation cladding system including aluminium parapet copings and a high pressure laminate board to ground floor entrance.
  • Prior to installation our surveyor carried out a concrete repair survey and prepared a detailed schedule showing the location and size of the repairs.
  • Concrete repairs were carried out to ensure the substrate was suitable for the application of the EWI and coping system.
  • Installation of EWI system consisting of 110mm mineral fibre insulation, 3mm scrim coat, 10mm base coat, with a real brick slip finish to the ground floor and a silicone render finish to all other floors.

Link to more photos of EWI Installation