Get Adobe Flash player

Wall Tie Installation and Concrete Repairs to Three Tower Blocks, Nottingham: 2015

Wall tie installation, concrete repairs and application of corrosion inhibitor to three "No-Fines" tower blocks in Nottingham.

Concrete Repairs to Five LPS Tower Blocks, Birmingham: 2016

Concrete repairs and application of corrosion inhibitor to the parapet panels of five LPS blocks in Birmingham.

Lintel Replacement, Sheffield: 2016

Replacement of defective concrete boot lintels to four storey block of maisonettes.

Bridge Repairs and Strengthening, Bristol: 2016

Sandstone arch bridge approx. 5 m wide requiring installation of sleeved (sock) anchors to strengthen the arch barrel and abutment walls.

Structural Repairs to Tower Block, Manchester: 2015-16

Remedial structural repairs to twenty storey tower block built circa.1960 in the heart of Eccles.

Concrete Repairs and Coatings, Barry Island Eastern Shelter, South Wales: 2014

Bersche-Rolt Ltd has completed concrete repair and coating works to the Grade II listed Barry Island Eastern Shelter, as part of the regeneration of the Eastern promenade for Vale of Glamorgan Council.

Structural Repairs and Mini-Piling, Wiltshire: 2013

Bersche-Rolt Engineer prepared a repair scheme using Chance Helical Piles as an alternative to the underpinning works recommended in the report to rectify the foundation subsidence.

EWI Installation, Birmingham: 2013

Installation of EWI system consisting of 110mm mineral fibre insulation, 3mm scrim coat, 10mm base coat, with a real brick slip finish to the ground floor and a silicone render finish to all other floors.